
A traffic management plan (TMP) is the approved document that lets your work happen on or near the road. Get it wrong and your job stalls at the approval stage. Get it right and your crew starts on time with the right controls in place.
Bay Traffic Management designs TMPs in-house in Hawke's Bay. Our planners create clear, compliant plans for worksites, road closures, events and temporary traffic setups, and because the same company designs the plan and delivers the crew and gear, what is drawn is what gets set up on the road.
What we cover
- TMPs for roadworks, construction and civil projects
- Construction traffic management plans for building sites and vehicle crossings
- Event TMPs, including road closure applications
- Corridor access requests (CARs) and council liaison
- Site assessments and traffic counts where required
- Plan amendments and fast re-approvals when the job changes
When do you need a traffic management plan?
In New Zealand, you generally need an approved TMP whenever work, an event or an activity affects the road, footpath, berm or pedestrian movement. That includes roadworks and utility work, construction site access, cranes and concrete pours, scaffolding over footpaths, and events that close or slow a road. The plan must be approved by the road controlling authority (usually the local council or NZTA) before work starts.
What our planners need from you
To design a practical plan we need the site location, the type of work, expected duration, and any specific access or risk factors. From there our in-house team designs the layout, prepares the documentation to the current NZGTTM risk-based approach, and manages the submission and approval with the road controlling authority.
Plan, crew and gear from one company
Many companies only draw plans. Because Bay Traffic Management also supplies the STMS, traffic controllers, signage and equipment, our plans are designed by people who set up sites every week. That means fewer surprises on the road, and one phone number when something needs to change mid-job.
The process
How it works
- 1
Tell us about the job
Fill in the quote form or ring us. A few details about the site, the work and the timing is all we need to get started.
- 2
Get your plan and price
We assess the site, design the traffic management approach and give you a fixed quote, including any council approvals needed.
- 3
We handle the road
Certified crew, compliant setup, gear on our own trucks. You run your job; we keep the traffic and your people safe.
FAQs
Traffic Management Plans questions
How long does TMP approval take?
Most councils ask for TMP submissions at least 5 to 15 working days before work starts, depending on the road and the complexity of the closure. Talk to us early and we will build the approval lead time into your programme.
Can you handle the council submission for us?
Yes. We prepare the TMP, lodge the corridor access request, and deal with the road controlling authority's questions until the plan is approved.
Do you do traffic management plans outside Hawke's Bay?
Our crews work across Hawke's Bay, but TMP design is a desk job: we can design and lodge plans for projects anywhere in New Zealand.
What does a TMP cost?
It depends on the road environment and the complexity of the closure. A simple shoulder closure plan costs far less than a full detour with night works. Send us the job details and we will give you a fixed quote.
Need traffic management sorted?
Tell us about the job and we will come back with a straight answer and a fixed quote.
